- Home Page /
- Industrial Supplies /
- Industrial Electrical /
- Optoelectronic Products /
- LED Equipment /
- Surface Emitting LEDs /
- 100pcs 5mm RGB Tri-Color Red Green Blue Multi...
100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Anode Diffused Round Lens 29mm Long Lead 300pcs Resistors for DC 6-12V
XCD 44
Price Details
Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )
*All items will import from US
QTY:
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
Illuminate your projects with our 100pcs RGB Tri-Color LED Diodes, complete with resistors for effortless integration!
Fast
Shipping
Free
Return*
Secure Packaging
100% Original Products
PCI DSS Compliance
ISO 27001 Certified
What Stands Out
Product Details
| Item Weight | 0.4 lbs (180 grams) |
Who Should Buy?
-
Hobby Electronics
Perfect for hobbyists building small electronic projects requiring colorful indicator lights or effects.
-
DIY Projects
Ideal for DIY enthusiasts looking to create custom lighting solutions in various home or craft projects.
-
Educational Use
Useful for students or teachers in electronics courses focusing on practical applications of LED technology.
-
Professional Installations
Not suitable for commercial-grade installations where high durability and reliability are essential.
Product Description
100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Anode Diffused Round Lens 29mm Long Lead 300pcs Resistors for DC 6-12V Included,Light Emitting Diodes
Customer Questions & Answers
-
Question:
What is the voltage requirement for these LEDs?
Answer: The red LEDs require DC 2.0-2.2V, while blue and green LEDs require DC 3.0-3.2V. -
Question:
Are resistors included with the LED diodes?
Answer: Yes, the package includes 300pcs of resistors for seamless integration. -
Question:
What is the viewing angle of these LED diodes?
Answer: The LED diodes have a wide viewing angle of 120°.
EDGELEC Surface Emitting LEDs Editorial Review
Customer Reviews & Ratings
-
5 Star
100%
-
4 Star
0%
-
3 Star
0%
-
2 Star
0%
-
1 Star
0%
Review this product
Share your thoughts with other customers
Platform Trust & Buyer Confidence
“The product received very good packaging & safe…Thank You”
“Accurate delivery timing given”
“Not madly expensive like I thought, and much quicker than promised.”
“Never dealt with Ubuy before, but everything worked out great. Seamless cross border purchasing and shipping. Thanks!”
“The process was smooth, with clear communication and timelines. This was my 1st purchase and I am really impressed. I will definitely be coming back.”
Product Price History
Important information
- Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
- Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.
XCD 44
Order now and get it around Monday, September 21
This item is not restrict in my country.(Please click on above link if this item is not restrict in your country, So our team will review and allow.)
QTY:
PCI DSS compliant and ISO 27001:2022 certified, with encrypted payments and full buyer protection on every order.
Features & Benefits
- Includes 100pcs of vibrant RGB Tri-Color LED Diodes.
- Comes with 300pcs of resistors for easy setup.
- Features 5mm diffused round lens for clear illumination.
- Common anode design ensures compatibility with various circuits.
- Brighter output with up to +20% luminance enhancement.
- Wide 120° viewing angle for maximum visibility.
Ubuy Assurance
Experience worry-free shopping with 100% original products, PCI DSS-compliant payment security, ISO 27001-certified data protection, the fastest cross-border delivery, free returns *, and secure packaging on every order.